{"id":456,"date":"2019-11-18T15:53:47","date_gmt":"2019-11-18T14:53:47","guid":{"rendered":"https:\/\/idec-grandsud.com\/db-groupeidec2\/blog\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/"},"modified":"2019-11-18T15:53:47","modified_gmt":"2019-11-18T14:53:47","slug":"sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault","status":"publish","type":"post","link":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/","title":{"rendered":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT)"},"content":{"rendered":"

SEQUABAT, the subsidiary of the IDEC GROUP specialising in the design and construction of turnkey projects involving business, commercial and residential property, is busy working on the care home for the elderly, les Jardins de Mireval (H\u00e9rault).<\/p>\n

With the backing of the DOMUSVI Group, which is a leading player in care and residential homes for the elderly, this project which will ultimately offer 65 beds spread over four buildings (A, B, C and D). Unit D, the frontage, flooring and paintwork of which is complete, will be made available in January 2020 to allow the interior to be fitted out. Access to units C, B and A will become possible in February and March 2020 with the final handover of the care home scheduled for May 2020.<\/p>\n

The SEQUABAT building teams are doing their utmost to respect the deadlines for the delivery of these buildings.<\/p>\n

The layout of the green areas will begin in late November with the surfaces to be laid in early December.<\/p>\n

This project is similar to another care home currently being built in Agen (Lot-et-Garonne), once again on behalf of the DOMUSVI company.<\/p>\n","protected":false},"excerpt":{"rendered":"

SEQUABAT, the subsidiary of the IDEC GROUP specialising in the design and construction of turnkey projects involving business, commercial and residential property, is busy working on the care home for…<\/p>\n","protected":false},"author":1,"featured_media":325,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[13],"tags":[],"yoast_head":"\nSEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB\" \/>\n<meta property=\"og:description\" content=\"SEQUABAT, the subsidiary of the IDEC GROUP specialising in the design and construction of turnkey projects involving business, commercial and residential property, is busy working on the care home for…\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\" \/>\n<meta property=\"og:site_name\" content=\"DB\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-18T14:53:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1520\" \/>\n\t<meta property=\"og:image:height\" content=\"950\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/db-groupeidec.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128\"},\"headline\":\"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT)\",\"datePublished\":\"2019-11-18T14:53:47+00:00\",\"dateModified\":\"2019-11-18T14:53:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\"},\"wordCount\":200,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/db-groupeidec.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg\",\"articleSection\":[\"Article|article-Flux-GRID-INFO-EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\",\"url\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\",\"name\":\"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB\",\"isPartOf\":{\"@id\":\"https:\/\/db-groupeidec.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg\",\"datePublished\":\"2019-11-18T14:53:47+00:00\",\"dateModified\":\"2019-11-18T14:53:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage\",\"url\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg\",\"contentUrl\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg\",\"width\":1520,\"height\":950},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/db-groupeidec.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/db-groupeidec.com\/#website\",\"url\":\"https:\/\/db-groupeidec.com\/\",\"name\":\"DB\",\"description\":\"D\u00e9couvrez DB, le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main d'immobilier d'entreprise, commercial et r\u00e9sidentiel.\",\"publisher\":{\"@id\":\"https:\/\/db-groupeidec.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/db-groupeidec.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/db-groupeidec.com\/#organization\",\"name\":\"DB\",\"url\":\"https:\/\/db-groupeidec.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/db-groupeidec.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2022\/11\/logo-db-130x155-fd-blc.png\",\"contentUrl\":\"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2022\/11\/logo-db-130x155-fd-blc.png\",\"width\":130,\"height\":155,\"caption\":\"DB\"},\"image\":{\"@id\":\"https:\/\/db-groupeidec.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/89293891\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/db-groupeidec.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/db-groupeidec.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/idec-grandsud.com\/idec-sante\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/","og_locale":"en_US","og_type":"article","og_title":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB","og_description":"SEQUABAT, the subsidiary of the IDEC GROUP specialising in the design and construction of turnkey projects involving business, commercial and residential property, is busy working on the care home for…","og_url":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/","og_site_name":"DB","article_published_time":"2019-11-18T14:53:47+00:00","og_image":[{"width":1520,"height":950,"url":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#article","isPartOf":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/"},"author":{"name":"J-Michel","@id":"https:\/\/db-groupeidec.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128"},"headline":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT)","datePublished":"2019-11-18T14:53:47+00:00","dateModified":"2019-11-18T14:53:47+00:00","mainEntityOfPage":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/"},"wordCount":200,"commentCount":0,"publisher":{"@id":"https:\/\/db-groupeidec.com\/#organization"},"image":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage"},"thumbnailUrl":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg","articleSection":["Article|article-Flux-GRID-INFO-EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/","url":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/","name":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT) - DB","isPartOf":{"@id":"https:\/\/db-groupeidec.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage"},"image":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage"},"thumbnailUrl":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg","datePublished":"2019-11-18T14:53:47+00:00","dateModified":"2019-11-18T14:53:47+00:00","breadcrumb":{"@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#primaryimage","url":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg","contentUrl":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg","width":1520,"height":950},{"@type":"BreadcrumbList","@id":"https:\/\/db-groupeidec.com\/en\/sequabat-continuing-to-work-on-the-construction-of-the-care-home-les-jardins-de-mireval-herault\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/db-groupeidec.com\/"},{"@type":"ListItem","position":2,"name":"SEQUABAT CONTINUING TO WORK ON THE CONSTRUCTION OF THE CARE HOME, LES JARDINS DE MIREVAL (HERAULT)"}]},{"@type":"WebSite","@id":"https:\/\/db-groupeidec.com\/#website","url":"https:\/\/db-groupeidec.com\/","name":"DB","description":"D\u00e9couvrez DB, le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main d'immobilier d'entreprise, commercial et r\u00e9sidentiel.","publisher":{"@id":"https:\/\/db-groupeidec.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-groupeidec.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-groupeidec.com\/#organization","name":"DB","url":"https:\/\/db-groupeidec.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-groupeidec.com\/#\/schema\/logo\/image\/","url":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2022\/11\/logo-db-130x155-fd-blc.png","contentUrl":"https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2022\/11\/logo-db-130x155-fd-blc.png","width":130,"height":155,"caption":"DB"},"image":{"@id":"https:\/\/db-groupeidec.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/89293891\/"]},{"@type":"Person","@id":"https:\/\/db-groupeidec.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-groupeidec.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/idec-grandsud.com\/idec-sante\/"]}]}},"uagb_featured_image_src":{"full":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",1520,950,false],"thumbnail":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-150x150.jpg",150,150,true],"medium":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-300x188.jpg",300,188,true],"medium_large":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-768x480.jpg",768,480,true],"large":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-1024x640.jpg",1024,640,true],"1536x1536":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",1520,950,false],"2048x2048":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",1520,950,false],"post-thumbnail":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-370x231.jpg",370,231,true],"qwery-thumb-huge":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-1290x725.jpg",1290,725,true],"qwery-thumb-big":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-840x473.jpg",840,473,true],"qwery-thumb-med":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-410x230.jpg",410,230,true],"qwery-thumb-tiny":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-120x120.jpg",120,120,true],"qwery-thumb-masonry-big":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-840x525.jpg",840,525,true],"qwery-thumb-masonry":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-410x256.jpg",410,256,true],"qwery-thumb-rectangle":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-570x696.jpg",570,696,true],"qwery-thumb-medium-square":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-650x572.jpg",650,572,true],"qwery-thumb-square":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-890x664.jpg",890,664,true],"qi_addons_for_elementor_image_size_square":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",650,406,false],"qi_addons_for_elementor_image_size_landscape":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",1040,650,false],"qi_addons_for_elementor_image_size_portrait":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",650,406,false],"qi_addons_for_elementor_image_size_huge-square":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval.jpg",1300,813,false],"trx_addons-thumb-small":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-270x152.jpg",270,152,true],"trx_addons-thumb-portrait":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-370x493.jpg",370,493,true],"trx_addons-thumb-avatar":["https:\/\/db-groupeidec.com\/wp-content\/uploads\/sites\/7\/2021\/08\/Mireval-370x370.jpg",370,370,true]},"uagb_author_info":{"display_name":"J-Michel","author_link":"https:\/\/db-groupeidec.com\/en\/"},"uagb_comment_info":0,"uagb_excerpt":"SEQUABAT, the subsidiary of the IDEC GROUP specialising in the design and construction of turnkey projects involving business, commercial and residential property, is busy working on the care home for…","_links":{"self":[{"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/posts\/456"}],"collection":[{"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/comments?post=456"}],"version-history":[{"count":0,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/posts\/456\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/media\/325"}],"wp:attachment":[{"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/media?parent=456"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/categories?post=456"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/db-groupeidec.com\/en\/wp-json\/wp\/v2\/tags?post=456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}